Tuesday, January 03, 2017

Revisiting the Marine Current Turbines capacity factor

Some while ago, in this blog post we calculated an apparent capacity factor for Marine Current Turbine's SeaGen in Strangford Narrows of 38%.

We've been rooting around in OFGEM's ROC database to see if there's further information available on SeaGen's performance.

Looking at the ROC register, which reports the number of MWh generated for ROC-accredited projects, it seems that the SeaGen achieved monthly average capacity factors of up to 58% in its best years.

This analysis is based on SeaGen having a capacity of 1.2 MW and is consistent with another blog analysis we did of the capacity factor of the technology.



This analysis begs some other questions though - what went wrong in 2011?  and has the technology been abandoned since 2014? It also seems that the capacity factor was pretty variable, pointing to a lack of reliability - fair enough in a prototype technology.

We'll be using this approach  to look at other technologies too, in the upcoming Redfield review of tidal technologies and its companion volume - Redfield review of wave technologies.  Contact us for details: info(at)redfieldconsulting.co.uk



Thursday, November 05, 2009

MCT power curve - analysis


MCT has just published a power curve for its Seagen device in Strangford Narrows (see figure above and link here). The curve shows a period of output at the design capacity of 1.2 MW, in what is described as a “medium tide”. This tide appears to have peaked at 3.1 m/s, which may be medium for Strangford, but is pretty impressive for most sites.

We realised that it’s possible to drill into this curve to come up with some (very) theoretical ideas of the capacity factor which might be achieved by the technology. First we constructed a velocity lookup table by taking a ruler to the graph, which shows the power output (kW) at various stream speeds (m/s).

m/s - Power
0 - 0
1 - 20
1.25 - 100
1.5 - 180
1.75 - 400
2 - 600
2.25 - 900
2.4 - 1200

We then constructed a model which characterises a simplified tidal environment, with stream speed varying according to a diurnal cycle (sinusoidal variation over 24 hours, in 2 flood, 2 ebb tides) and a 28 day lunar cycle (again simple sinusoidal variation).

We entered a maximum stream speed (peak rate achieved at spring tide) and a minimum stream speed (peak rate achieved at neap tide) and constructed a lookup on an hour by hour basis to estimate the power output over a month.

Based on a maximum stream speed of 3.2 m/s and a minimum stream speed of 1.6 m/s (ie neap maximum is half as fast as spring maximum), we find that the average theoretical power output (assuming no outages) to be 450 kW, making the capacity factor 38%.

The model shows that output is sensitive to both maximum stream speed and the ratio between spring and neap peak rates. The table below shows the relationship between capacity factor and the maximum stream speed) assuming that neaps are limited to 50% of the maximum stream speed in springs. The month-average capacity factor for various maximum spring stream speeds is:

m/s - CF (%)
2.8 - 28%
3 - 34%
3.2 - 38%
3.5 - 45%
4 - 53%
The table below shows how the capacity factor is influenced by the ratio between the maximum neap speed and the maximum spring speed based on a maximum spring stream speed of 3.2 m/s. The table shows maximum neap speed and month-average capacity factor.

m/s - CF (%)
0.8 - 31%
1.2 - 33%
1.6 - 38%
2.1 - 45%
2.4 - 48%

All of these power output estimates are wildly theoretical – and should be treated with extreme caution. Next we’re going to combine this power curve with some actual tidal data from tidal diamonds on charts to see how that looks.

Saturday, February 09, 2008

MCT/npower














Interesting announcement from MCT and npower. npower has joined with MCT in a new company Seagen Wales, which will pursue the project.

They say that "Development of the site will start with a full assessment and detailed surveys of the environment and tidal resources, followed by preparation of an outline scheme incorporating the studies' outcomes.

Studies are about to get started and will last throughout 2008, with a consent application likely to be submitted in mid 2009. Construction and commissioning timescales will be subject to the length of the planning process, but it is anticipated this could take place between 2011 and 2012."

Of the big six utilities (Centrica, EdF, Eon, RWE, SSE, Scottish Power), five have now announced marine renewables aspirations:

EdF has a shareholding in Marine Current Turbines;
Eon has an involvement in the Lunar/Rotech Pembrokeshore tidal project
RWE (npower) has just announced this investment
SSE has the Neptune tidal and Aquamarine wave interests
Scottish Power (Iberdrola) has its Orkney Pelamis project

Surely Centrica's got to move soon?

Wednesday, October 31, 2007

Pretty soon....


you'll be able to walk across the Bay of Fundy, leaping from tidal device to tidal device, without touching the water.

The map (thanks Google) shows where the Bay of Fundy lies, on the eastern seaboard of North America.

Now Marine Current Turbines has announced an agreement with the Maritime Tidal Energy Consortium to develop a project in the Bay of Fundy. It joins Open Hydro, and Ocean Renewable Power in planning projects in this area, which benefits from the highest tidal ranges in the world. There are also some suggestions out there on the internet that a tidal barrage might be an option.

The question in my mind is whether there are areas with attractive stream speeds too, but this entry on the Bay of Fundy blog clearly recognises that sites are available.